Information
Product data | |
---|---|
Brand | Wilo |
Product description | Atmos GIGA-N 40/125-0,25/4 |
Article number | 6086305 |
EAN number | 4048482981123 |
Colour | Green |
Minimum order quantity | 1 |
Date of sales availability | 2019-03-01 |
Packaging | |
---|---|
Packaging type | Special pallet |
Packaging property | Transport packaging |
Pieces per pallet | 1 |
Number per layer | 1 |
Dimension, weight | |
---|---|
Length with packaging | 1200 mm |
Length L | 835 mm |
Height with packaging | 475 mm |
Height H | 335 mm |
Width with packaging | 500 mm |
Width W | 360 mm |
Gross weight, approx. m | 96 kg |
Net weight, approx. m | 85 kg |
Data
Materials | |
---|---|
Pump housing | 5.1301/EN-GJL-250 KTL-coated |
Impeller | Grey cast iron |
Lantern | Grey cast iron |
Shaft | Stainless steel |
Shaft seal | AQ1EGG |
Operating Data | |
---|---|
Min. fluid temperature Tmin | -20 °C |
Max. fluid temperature Tmax | 140 °C |
Maximum operating pressure p | 16.0 bar |
Max. ambient temperature Tmax | 40 °C |
Minimum efficiency index (MEI) | ≥0.4 |
Motor data | |
---|---|
Mains connection | 3~400 V, 50 Hz |
Voltage tolerance | ±10 % |
Motor efficiency class | IE3 |
Rated power P2 | 250 W |
Rated speed n | 1390 1/min |
Rated current IN | 0.68 A |
Power factor cos φ | 0.65 |
Motor efficiency ηM 50% | 69 % |
Motor efficiency ηM 75% | 72 % |
Motor efficiency ηM 100% | 73.5 % |
Protection class | IP55 |
Insulation class | F |
Installation dimensions | |
---|---|
Pipe connection on the suction side DNs | DN 65 |
Pipe connection on the discharge side DNd | DN 40 |
Standard | ISO 9906 3B |
Fluid media | Water 100 % |
Fluid temperature T | 20,00 °C |
speed at duty point n hydr. @ OP | 1.451 1/min |
Impeller diameter d imp. | 146 mm |
∆: Connection diagram delta connection
Y: Connection diagram star connection
Motor protection switch required on-site. Check the direction of rotation! To change the direction of rotation, exchange any two phases.
P2≤ 3 kW | 3~400 V Y |
3~230 V ∆ | |
P2≥ 4 kW | 3~690 V Y |
3~400 V ∆ |
After removing the bridges, Y-∆ start is possible.
*รอสินค้า 40-60วัน